首页> 美国政府科技报告 >Hanford Site Comprehensive site Compliance Evaluation Report
【24h】

Hanford Site Comprehensive site Compliance Evaluation Report

机译:Hanford网站综合网站合规性评估报告

获取原文

摘要

This document is the second annual submittal by WHC, ICF/KH, PNL and BHI and211u001econtains the results of inspections of the stormwater outfalls listed in the 211u001eHanford Site Storm Water Pollution Prevention Plan (SWPPP) (WHC 1993a) as 211u001erequired by General Permit No. WA-R-00-000F (WA-R-00-A17F): This report also 211u001edescribes the methods used to conduct the Storm Water Comprehensive Site 211u001eCompliance Evaluation, as required in Part IV, Section D, C ofthe General Permit, 211u001esummarizes the results of the compliance evaluation, and documents significant 211u001eleaks and spills.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号