首页> 美国政府科技报告 >Development and Testing of Industrial Scale, Coal Fired Combustion System, Phase 3. Twentieth Quarterly Technical Progress Report. Period Covered by Report October 1, 1996 to December 31, 1996
【24h】

Development and Testing of Industrial Scale, Coal Fired Combustion System, Phase 3. Twentieth Quarterly Technical Progress Report. Period Covered by Report October 1, 1996 to December 31, 1996

机译:工业规模,燃煤燃烧系统的开发和测试,第3阶段。第20季度技术进步报告。报告所涵盖的期间为1996年10月1日至1996年12月31日

获取原文

摘要

In the fourth quarter of calendar year 1996, 15 days of combust-boiler tests were performed, including 10 days of tests on a parallel DOE sponsored project on sulfur retention in a slagging combustor. Between tests, modifications and improvements that were indicated by these tests were implemented. This brings the total number of test days to the end of December in the task 5 effort to 57, increased to 65 as of the date of this Report, 1/27/97. This compares with a total of 63 test days needed to complete the task 5 test effort, and it completes the number of tests days required to meet the task 5 project plan. The key project objectives of the areas of combustor performance and environmental performance have been exceeded. With sorbent injection in the combustion gas train, NOX emissions as low as 0.07 lb/MMBtu and S02 emissions as low as 0.2 lb/MMBtu have been measured in tests in this quarter. Work in the next quarter will focus on even greater reductions in environmental emissions. Also tests are planned with coals other than the Eastern US bituminous coals tested in this project. For example, it is planned to tests Indian coals whose ash concentration is in the 40 (approx) 0 range.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号