首页> 美国政府科技报告 >Fiscal year 1996 well plugging and abandonment program Y-12 Plant, Oak Ridge, Tennessee
【24h】

Fiscal year 1996 well plugging and abandonment program Y-12 Plant, Oak Ridge, Tennessee

机译:1996财政年度封堵和放弃计划Y-12工厂,田纳西州橡树岭

获取原文

摘要

This report is a synopsis of the progress of the well plugging and abandonment program at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, from August 1995 through August 1996. A total of 27 wells, piezometers, and borings were plugged and abandoned during the period of time covered in this report. All wells and borings were plugged and abandoned in accordance with the Monitoring Well Plugging and Abandonment Plan for the U.S. Department of Energy, Y-12 Plant, Oak Ridge, Tennessee (HSW, Inc. 1991).

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号