首页> 美国政府科技报告 >Aespoe HRL - Geoscientific evaluation 1997/3. Results from pre- investigation and detailed site characterization. Comparison of predictions and observations. Geology and mechanical stability
【24h】

Aespoe HRL - Geoscientific evaluation 1997/3. Results from pre- investigation and detailed site characterization. Comparison of predictions and observations. Geology and mechanical stability

机译:aespoe HRL - 地球科学评估1997/3。预调查和详细的场地特征描述的结果。预测和观察的比较。地质和机械稳定性

获取原文

摘要

Prior to excavation of the laboratory in 1990 predictions were made for the excavation phase. The predictions concern five key issues: Geology, groundwater flow, groundwater chemistry, transport of solutes, and mechanical stability. Comparisons between predictions and observations were made during excavation in order to verify the reliability of the pre-investigations. This report presents a comparison between the geological and mechanical stability predictions and observations and an evaluation of data and investigation methods used for the 700-2874 m section of the tunnel. The report is specially highlighting the following conclusions: It is possible to localize major fracture zones during the pre-investigation at shallow (<200 m) depths; A number of minor fracture zones striking NNW-NNE were predicted to be hydraulically important and penetrate the southern area. A number of narrow fracture zone indications - 0.1- 1 m wide - striking WNW-NE were mapped in the tunnel and pre-grouted sections confirm hydraulic conductors; It has not been possible to confirm the gently dipping zone EW-5, which was predicted as 'possible', with data from the tunnel; Predictions of the amount of different rock types were generally reliable as regards the major rocks, but the prediction of the distribution in space were poor as regards the minor rock types; The prediction of rock stress orientation corresponds well to the outcome; The prediction of rock quality for the tunnel, while applying the RMR-system, shows good correspondence to the observations made in the tunnel. 59 refs, 51 figs, 21 tabs.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号