Eesti Gaas. Report on project execution and finalization. Modernization of distribution stations, Estonia

机译:Eesti Gaas。关于项目执行和最终确定的报告。爱沙尼亚配电站的现代化

获取原文

摘要

The objective of the project has been, based on a review of the existing main types of distribution stations prevailing in Estonia, to carry out a basic design of 2 to 3 standard stations with different capacities as a part in a modernization programme. The objectives have been met as follows: Based on the document review of the existing main types of stations in Estonia the operating parameters were outlined for four types of stations: Basic design concepts for district regulator stations cover 2 low pressure district regulator stations of the following capacities: 6/0.020 bar cabinet type regulator station with a max. flow rate of 200 Nm(sup 3)/h; 3/0.020 bar regulator station with a max. flow rate of 1,000 Nm(sup 3)/h. Basic design have been prepared for two sizes of city gate meter and regulator stations. (EG)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号