首页> 美国政府科技报告 >1.8.2.1.2 Site system engineering implementation Fiscal Year 1998 multi- year work plan
【24h】

1.8.2.1.2 Site system engineering implementation Fiscal Year 1998 multi- year work plan

机译:1.8.2.1.2现场系统工程实施1998财年多年工作计划

获取原文

摘要

Manage the Site Systems Engineering process to provide a traceable, integrated, requirements-driven, and technically defensible baseline., Through the Site Integration Group, Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the Project Direction Office and with the projects, as well as with the Planning organization.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号