Surveillance strategy for an extended operating cycle in commercial nuclear reactors

机译:商业核反应堆延长运行周期的监督战略

获取原文

摘要

The impetus for improved economic performance of commercial nuclear power plants can be partially satisfied by increasing plant capacity factors through operating cycle extension. One aspect of an operating cycle extension effort is the modification of plant surveillance programs to complete required regulatory and investment protection surveillance activities within the extended planned outage schedule. The goal of this paper is to introduce a general strategy for existing power plants to transition their surveillance programs to an extended operating cycle up to 48 months in length, and to test the feasibility of this strategy through the complete analysis of the surveillance programs at operating BWR and PWR case study plants. The reconciliation of surveillances at these plants demonstrates that surveillance performance will not preclude 48 month operating cycles. Those surveillance activities that could not be resolved to an extended cycle are identified for further study. Finally, a number of general issues are presented that should be considered before implementing a cycle extension effort.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号