首页> 美国政府科技报告 >Construction and operation of a tritium extraction facility at the Savannah River Site. Draft environmental impact statement
【24h】

Construction and operation of a tritium extraction facility at the Savannah River Site. Draft environmental impact statement

机译:在萨凡纳河遗址建造和运营氚提取设施。环境影响报告草案

获取原文

摘要

DOE proposes to construct and operate a Tritium Extraction Facility (TEF) at H Area on the Savannah River Site (SRS) to provide the capability to extract tritium from commercial light water reactor (CLWR) targets and from targets of similar design. An action alternative is to construct and operate TEF at the Allied General Nuclear Services facility, which is adjacent to the eastern side of the SRS. Under the no-action alternative DOE could incorporate tritium extraction capabilities in the accelerator for production of tritium should the accelerator be selected as the primary source of tritium. This EIS is linked to the Final Programmatic Environmental Impact Statement for Tritium Supply and Recycling (DOE/EIS-0161), from which DOE determined that it would produce tritium either in an accelerator or in a commercial light water reactor. The purpose of the proposed action and alternatives evaluated in this EIS is to provide tritium extraction capability to support either tritium production technology.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号