Office of Inspector General summary report on inspection of issues associated with the Department of Energy`s tritium source selection process

机译:监察长办公室关于检查与能源部氚源选择过程有关的问题的总结报告

获取原文

摘要

The Office of Inspector General received a letter dated August 31, 1998, from Senator Strom Thurmond concerning the selection of the tritium production source. The letter stated that information had been received which suggested that certain senior level Department officials may have engaged in a systematic effort to undermine the validity of the Accelerator for the Production of Tritium (APT) option, and that the then Deputy Secretary of Energy directed subordinates to fire an official in the Office of Defense Programs because this official had raised concerns about the cost evaluations of the two tracks, the APT and the Commercial Light Water Reactor (CLWR) option. The objective of this inspection was to address questions presented in the August 31, 1998, letter. The inspection found no persuasive evidence that there was a systematic effort to undermine the validity of the APT option. Similarly, the auditors did not find evidence that Department principals or staff worked to improperly influence the outcome of the Dual Track process to advance one option over the other.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号