首页> 美国政府科技报告 >Measurements of delayed neutron yields from thermal neutron induced fission of (sup 235)U, (sup 233)U, (sup 239)Pu, and (sup 237)Np
【24h】

Measurements of delayed neutron yields from thermal neutron induced fission of (sup 235)U, (sup 233)U, (sup 239)Pu, and (sup 237)Np

机译:热中子诱发裂变(sup 235)U,(sup 233)U,(sup 239)pu和(sup 237)Np的延迟中子产额的测量

获取原文

摘要

The experimental results on delayed neutron (DN) yields from thermal neutron induced fission of some actinides on the IBR-2 pulsed reactor are presented. A method of periodic irradiation without displacement of the sample was used. Precise measurements of decay curves in the time interval of 5-350 ms for (sup 235)U and (sup 239)Pu were performed. The measurements of DN total yields in thermal neutron induced fission of (sup 239)Pu, (sup 233)U, and (sup 237)Np and in cold neutron induced fission of (sup 235)U, (sup 233)U, and (sup 239)Pu were carried out. All values were obtained using the value of (beta)(sub 0) for (n(sub th) + (sup 235)U) as a standard 26 refs., 7 figs., 4 tabs.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号