首页> 美国政府科技报告 >Fiscal year 1999 multi-year work plan, advanced reactors transition program
【24h】

Fiscal year 1999 multi-year work plan, advanced reactors transition program

机译:1999财政年度多年工作计划,先进反应堆过渡计划

获取原文

摘要

The Advanced Reactors Transition (ART) has two missions. One, funded by DOE- EM is to transition assigned, surplus facilities to a safe and compliant, low- cost stable, deactivated condition (requiring minimal surveillance and maintenance) pending eventual reuse or D and D. Facilities to be transitioned include the 309 Building/Plutonium Recycle Test Reactor (PRTR) and Nuclear Energy (NE) Legacy Facilities. The second mission, funded by DOE-NE, is to maintain the Fast Flux Test Facility (FFTF) and affiliated 400 Area buildings in a safe and compliant standby condition. The condition of the plant hardware, software and personnel is to be preserved in a manner not to preclude a plant restart.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号