首页> 美国政府科技报告 >Annual Summary Report, February to December 1998, for the100-HR-3 and 100-KR-4 Pump-and-Treat Operations and Operable Units
【24h】

Annual Summary Report, February to December 1998, for the100-HR-3 and 100-KR-4 Pump-and-Treat Operations and Operable Units

机译:1998年2月至12月的年度总结报告,用于100-HR-3和100-KR-4泵送和处理操作和可操作单元

获取原文

摘要

This annual summary report discusses the interim remedial actions at the 100-HR-3 and 100-KR-4 Operable Units (OUs) for February 1,1998, through December 31, 1998. This is the second annual summary report that has been submitted for these OUs; the first report was released in April 1998 (DOE-RL 1998). Ongoing annual summaries and performance evaluations of each of the pump-and-treat systems are required by the Remedial Design Report and Remedial Action Work Plan for the 100-HR-3 and 100-KR-4 Groundwater Operable Units' Interim Action (RDR/RAWP) (DOE-RL 1996).

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号