Project W-519 TWRS privatization phase 1 infrastructure year 2000 compliance assessment project plan

机译:项目W-519 TWRs私有化第1阶段基础设施2000年合规评估项目计划

获取原文

摘要

This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-519, Tank Waste Remediation System Privatization Phase I Infrastructure Support. The purpose of this assessment is to give an overview of the project. This assessment will describe the methods, protocols, and practices to assure that equipment and systems do not have Y2K problems. This document will not be updated and any dates contained in this document are estimates and may change. The scope of project W-519 is to provide utilities and infrastructure to support construction and operation of the private contractor's facility to treat, immobilize, and dispose of tank waste. The private contractor's facility will be located on east side of 200E-area and north of Route 4s (near the defunct grout vaults). The utilities include potable and process water, construction and operational electrical power systems, and liquid effluent disposal transfer lines to the existing effluent treatment facility (ETF) and the liquid effluent retention facility (LERF).

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号