首页> 美国政府科技报告 >Design-Only Conceptural Design Report Plutonium Immobilization Plant
【24h】

Design-Only Conceptural Design Report Plutonium Immobilization Plant

机译:设计专用概念设计报告钚固定装置

获取原文

摘要

This document provides the basis for the procurement of design and engineering services for a Plutonium Immobilization Plant (PIP). The PIP would convert non-pit surplus plutonium metals to an oxide. The converted plutonium oxide, as well as other surplus plutonium oxide from DOE sites, would be converted into a ceramic material that is placed in metal cans. The cans would be loaded into magazines that are placed into a framework inside a Defense Waste Processing Facility (DWPF) canister. High-level waste (HLW) glass would then be poured into the canister at the DWPF to form a radiation barrier in the final product. The immobilized plutonium waste form (IPWF)--the cans of plutonium ceramic inside a HLW canister filled with HLW glass--is stored in the Glass Waste Storage Building (GWSB), along with the high-level waste canisters, pending geologic disposal.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号