首页> 美国政府科技报告 >As-Built Verification Plan Spent Nuclear Fuel Canister Storage Building MCO Handling Machine
【24h】

As-Built Verification Plan Spent Nuclear Fuel Canister Storage Building MCO Handling Machine

机译:竣工验证计划用于核燃料罐存储建筑mCO处理机

获取原文

摘要

This as-built verification plan outlines the methodology and responsibilities that will be implemented during the as-built field verification activity for the Canister Storage Building (CSB) MCO Handling Machine (MHM). This as-built verification plan covers the electrical portion of the construction performed by power city under contract to MOWAT. The as-built verifications will be performed in accordance Administrative Procedure AP 6-012-00, Spent Nuclear Fuel Project As-Built Verification Plan Development Process, revision I. The results of the verification walkdown will be documented in a verification walkdown completion package, approved by the Design Authority (DA), and maintained in the CSB project files.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号