首页> 美国政府科技报告 >Variable-Speed Generation Subsystem Using the Doubly-Fed Generator; Period of Performance February 9, 1994-April 30, 1999
【24h】

Variable-Speed Generation Subsystem Using the Doubly-Fed Generator; Period of Performance February 9, 1994-April 30, 1999

机译:性能周期1994年2月9日 - 1999年4月30日使用双馈发电机的变速发电子系统;

获取原文

摘要

Over the past decade, fixed-speed, utility-scale wind turbines have technically advanced to a point where they can economically complete against nuclear and fossil-fuel-based power plants in geographical areas with a sufficient wind resource. The objective of this subcontract was to compare various electrical topologies allowing variable-speed turbine operation, identify the most suitable for a 275-kW (or larger) utility-scale wind turbine, and then design, build, lab test, and field test this variable-speed generation subsystem based on the previously identified optimum approach. Preliminary tests of the controls for a doubly fed variable-speed generation system rated at 750 kW were performed on a wind turbine. A 275-kW VSGS was thoroughly tested in the laboratory and on a wind turbine. Using field-oriented control, excellent dynamic behavior of the drive train was demonstrated, acoustic tests revealed an 11 dB reduction in turbine noise in low-wind, low-RPM operation compared to fixed-speed operation. The overall efficiency of the electrical system suffered from inadequate efficiency of the power converter at low power. Consequently, a different converter topology has been proposed that will satisfy both efficiency and power quality requirements for future use. This report provides information on all aspects of the project, including events that were unanticipated at the outset. A great deal of information is available in the references, comprised of NREL reports, journal articles, and conference papers on specific project results.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号