首页> 美国政府科技报告 >FY 1999 cold demonstration of the Multi-Point Injection (MPI) process for stabilizing contaminated sludge in buried horizontal tanks with limited access at the Oak Ridge National Laboratory
【24h】

FY 1999 cold demonstration of the Multi-Point Injection (MPI) process for stabilizing contaminated sludge in buried horizontal tanks with limited access at the Oak Ridge National Laboratory

机译:1999年度的多点注入(mpI)过程的冷演示,用于稳定埋藏水平储罐中受污染的污泥,在橡树岭国家实验室有限的通道

获取原文

摘要

A major problem faced by the U.S. Department of Energy is the remediation of buried tank waste. Exhumation of the sludge is currently the preferred remediation method. However, exhumation does not typically remove all the contaminated material from the tank. The best management practices for in-tank treatment of wastes require an integrated approach to develop appropriate treatment agents that can be safely delivered and uniformly mixed with the sludge. Ground Environmental Services, Inc., has developed and demonstrated a remotely controlled, high-velocity, jet-delivery system, which is termed Multi- Point-Injection (MPI(trademark)). This robust jet-delivery system has been used to create homogeneous monoliths containing shallow-buried miscellaneous waste in trenches (fiscal year (FY) 1995) and surrogate sludge in a cylindrical test tank (FY 1998). During the FY 1998 demonstration, the MPI process was able to successfully form a 32-ton uniform monolith in about 8 min. Analytical data indicated that 10 tons of a zeolite-type physical surrogate were uniformly mixed within the 40-inch-thick monolith without lifting the MPI jetting tools off the tank floor. Over 1,000 lb of cohesive surrogates, with consistencies of Gunite and Associated Tanks (GAATs) TH-4 and Hanford tank sludges, were easily mixed into the monolith without exceeding a core temperature of 100 F during curing.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号