首页> 美国政府科技报告 >Scaled Vitrification System III (SVS III) Process Development and LaboratoryTests at the West Valley Demonstration Project
【24h】

Scaled Vitrification System III (SVS III) Process Development and LaboratoryTests at the West Valley Demonstration Project

机译:西瓦谷示范项目的比例玻璃化系统III(sVs III)工艺开发和实验室测试

获取原文

摘要

At the West Valley Demonstration Project (WVDP), the Vitrification Facility (VF)is designed to convert the high-level radioactive waste (HLW) stored on the site to a stable glass for disposal at a Department of Energy (DOE)-specified federal repository. The Scaled Vitrification System III (SVS-III) verification tests were conducted between February 1995 and August 1995 as a supplemental means to support the vitrification process flowsheet, but at only one seventh the scale. During these tests, the process flowsheet was refinedand optimized. The SVS-III test series was conducted with a focus on confirming the applicability of the Redox Forecasting Model, which was based on the Index of Feed Oxidation (IFO) developed during the Functional and Checkout Testing of Systems (FACTS) and SVS-I tests. Additional goals were to investigate the prototypical feed preparation cycle and test the new target glass composition. Included in this report are the basis and current designs of the major components of the Scale Vitrification System and the results of the SVS-III tests. The major subsystems described are the feed preparation and delivery, melter, and off-gas treatment systems. In addition,the correlation between the melter s operationand its various parameters which included feed rate, cold cap coverage, oxygen reduction (redox) state of the glass melter power, plenum temperature, and airlift analysis were developed.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号