首页> 美国政府科技报告 >Component and processes that enabled los alamos national laboratory to shiptransuranic waste to wipp or what it took to smooth the final speed bumps on the road to wipp
【24h】

Component and processes that enabled los alamos national laboratory to shiptransuranic waste to wipp or what it took to smooth the final speed bumps on the road to wipp

机译:组件和流程使洛斯阿拉莫斯国家实验室能够将过渡性废物运送到wipp,或者在通往wipp的道路上平滑最终速度颠簸

获取原文

摘要

Los Alamos National Laboratory (LANL) sent the historic first load of transuranic(TRU) waste to the Waste Isolation Pilot Plant (WIPP) on March 25, 1999. The cheers of supporters and the groans of protesters that night marked the end of the last two years in the effort to open the world's first permitted TRU waste disposal site. This paper documents the more significant events that occured in the two years prior to LANL's first shipment to WIPP. In addition, a chronology is provided with further details of the drama associated with LANL's historic first shipment.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号