首页> 美国政府科技报告 >Low cost methodologies to analyze and correct abnormal production decline in stripper gas wells. Quarterly technical report, April 1-June 30, 2000
【24h】

Low cost methodologies to analyze and correct abnormal production decline in stripper gas wells. Quarterly technical report, April 1-June 30, 2000

机译:用于分析和纠正汽提塔气井异常产量下降的低成本方法。季度技术报告,2000年4月1日至6月30日

获取原文

摘要

The goal of this research program is to develop and deliver a procedure guide of low cost methodologies to analyze and correct problems with stripper wells experiencing abnormal production declines. A study group of wells will provide data to determine the historic frequency of the problem of abnormal production declines in stripper gas wells and the historic frequency of the causes of the production problems. Once the most frequently occurring causes of the production problems are determined, data collection forms and decision trees will be designed to cost-effectively diagnose these problems and suggest corrective action. Finally, economic techniques to solve the most frequently occurring problems will be researched and implemented. These systematic methodologies and techniques will increase the efficiency of problem assessment and implementation of solutions for stripper gas wells. This third quarterly technical report was to describe the data reduction and methodologies to develop decision trees, identify cost effective techniques to solve the most frequently experienced problems and then apply the methodology to a group of wells where recent problems have developed. Further, this third quarterly technical report was to describe the data reduction and methodologies to select the two wells with the greatest potential for increase and also having the most frequently occurring problem, and evaluate the results of the methodology and the implemented procedure. However, preparation and analysis of the decision trees is more complex than initially anticipated due to the combination of problems rather than identifiable individual problems. Therefore, this portion of the study is still in progress. We have requested and been granted verbal approval for a six month no cost extension to allow more time to thoroughly investigate this portion of the study. The delivery of the decision trees will be included in future technical reports. Work on the other tasks to be completed in this third quarterly report could not begin until completion of the decision trees.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号