首页> 美国政府科技报告 >Characterization of Stochastic Uncertainty in the 1996 Performance Assessment for the Waste Isolation Pilot Plant;Reliability Engineering and System Safety (Special Journal Issue)
【24h】

Characterization of Stochastic Uncertainty in the 1996 Performance Assessment for the Waste Isolation Pilot Plant;Reliability Engineering and System Safety (Special Journal Issue)

机译:1996年废物隔离试验工厂性能评估中随机不确定性的表征;可靠性工程和系统安全(特刊)

获取原文

摘要

The 1996 performance assessment (PA) for the Waste Isolation Pilot Plant (WIPP) maintains a separation between stochastic (i.e., aleatory) and subjective (i.e., epistemic) uncertainty arising from the possible disruptions that could occur at the WIPP over the 10,000 yr regulatory period specified by the U.S. Environmental Protection Agency (40 CFR 191, 40 CFR 194) and subjective uncertainty arising from an ability to uniquely characterize many of the inputs required in the 1996 WIPP PA. The characterization of stochastic uncertainty is discussed, including drilling intrusion time, drilling location, penetration of excavated/nonexcavated areas of the repository, penetration of pressurized brine beneath the repository, borehole plugging patterns, activity level of waste, and occurrence of potash mining. Additional topics discussed include sampling 'procedures, generation of individual 10,000 yr futures for the WIPP, construction of complementary cumulative distribution functions (CCDFs), mechanistic calculations carried out to support CCDF construction, the Kaplan/Garrick ordered tuiple representation for risk, and determination of scenarios and scenario probabilities'.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号