首页> 美国政府科技报告 >Initial Field Deployment Results of Green PCB Removal from Sediment Systems (GPRSS).
【24h】

Initial Field Deployment Results of Green PCB Removal from Sediment Systems (GPRSS).

机译:从沉积物系统中去除绿色pCB的初始现场部署结果(GpRss)。

获取原文

摘要

The goal of this task order was to complete optimization and development of the Green PCB Remediation from Sediment Systems(GPRSSs) technology, culminating in the production of functioning demonstration test units which would be deployed at a suitable demonstration location. This location would be selected in conjunction with Toxicological & Ecological Associates who have entered into a SAA with NASA to partner with and further develop this technology. The GPRSSs technology was initially developed under ESC Task Order 83 with the purpose of providing a green remediation technology capable of in-situ removal and remediation of polychlorinated biphenyls (PCBs) from contaminated sediments. The core concept of the technology, a polymeric blanket capable of absorbing PCBs when in contact with contaminated sediments was then transitioned to Task Order 165 where the primary objective was to fully design and optimize a functioning test unit capable of testing the theoretical and laboratory scale concepts in a real world situation. Results from both task orders are included in this report for completeness, although Task Order 165 focused on the blanket design and the small scale field demonstration in which is currently still ongoing in Altavista, VA.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号