首页> 美国政府科技报告 >Preliminary Design Services Research and Development Report No. 114,July--September 1975. Interim Report No. 2.
【24h】

Preliminary Design Services Research and Development Report No. 114,July--September 1975. Interim Report No. 2.

机译:1975年7月至9月第114号初步设计服务研究与发展报告。第2号中期报告。

获取原文

摘要

The objective of the work is to develop preliminary designs and economic evaluations for a number of coal conversion plants. The following designs are included in the scope of work: a conceptual commercial plant for a Coal-Oil-Energy-Development (COED) plant;an Oil/Gas plant to produce liquid fuels plus substitute natural gas (SNG); a commercial-scale Fischer-Tropsch plant with motor fuel and SNG as the main products; a commercial-scale plant for the production of solvent-refined coal (SRC); a Coal Oil Gas Refinery (COG) to produce clean liquids,gas and electrical power generating capacity;and a facilities complex capable of demonstrating the commercial feasibility of a variety of coal conversion processes that show promise during pilot plant operations. The following facilities will be considered;conversion of coal to low to high Btu fuel gas methanol/motor fuel by Fischer-Tropsch process;and clean liquid fuels by alternate liquefaction processes. In addition,supporting efforts will be provided to the above activities. These efforts include planning and progress monitoring,equipment development,and environmental factors.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号