首页> 美国政府科技报告 >GDH pipe break transient analysis of the RBMK - 1500.
【24h】

GDH pipe break transient analysis of the RBMK - 1500.

机译:RBmK - 1500的GDH管道破裂瞬态分析。

获取原文

摘要

Presented in this paper is the transient analysis of a Group Distribution Header (GDH) following a guillotine break at the end of the header. The GDH is the most important component of reactor safety in case of accidents. Emergency Core Cooling System (ECCS) piping is connected to the GDH piping such that, during an accident, coolant passes from the GDH into the ECCS. The GDH that is propelled into motion after a guillotine break can impact neighboring GDH pipes or the nearest wall of the compartment. The cases of GDH impact on an adjacent GDH and its attached piping are investigated in this paper. A whipping RBMK-1500 GDH along with neighboring concrete walls and pipelines is modeled using finite elements. The finite element code NEPTUNE used in this study enables a dynamic pipe whip structural analysis that accommodates large displacements and nonlinear material characteristics. The results of the study indicate that a whipping GDH pipe would not significantly damage adjacent walls or piping and would not result in a propagation of pipe failures.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号