首页> 美国政府科技报告 >ESTIMATES FOR RELEASE OF RADIONUCLIDES FROM POTENTIALLY CONTAMINATED CONCRETE AT THE HADDAM NECK NUCLEAR PLANT.
【24h】

ESTIMATES FOR RELEASE OF RADIONUCLIDES FROM POTENTIALLY CONTAMINATED CONCRETE AT THE HADDAM NECK NUCLEAR PLANT.

机译:哈达姆核电厂潜在污染混凝土释放放射性核素的估算。

获取原文

摘要

Decommissioning of the Haddam Neck Nuclear Power Plant operated by Connecticut Yankee is in progress. Figure 1 shows a schematic of the Containment Building and Spent Fuel Pool (SFP) Building. Consideration is being given to leaving some subsurface concrete from the Containment, Spent Fuel and certain other buildings in place following NRC license termination. Characterization data of most of these structures show small amounts of residual contamination. The In-Core Sump area of the Containment Building has shown elevated levels of tritium, Co-60, Fe-55, and Eu-152 and lesser quantities of other radionuclides due to neutron activation of the concrete in this area. This analysis is provided to determine levels of residual contamination that will not cause releases to the groundwater in excess of the acceptable dose limits. The objective is to calculate a conservative relationship between the radionuclide concentration of subsurface concrete and the maximum groundwater concentration (pCi/L) for the concrete that may remain following license termination at Connecticut Yankee.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号