首页> 美国政府科技报告 >Impact of the Proposed Addition of 3 Un-Extracted Cycle 6 TPBARs to the Lead Teset Assembly
【24h】

Impact of the Proposed Addition of 3 Un-Extracted Cycle 6 TPBARs to the Lead Teset Assembly

机译:拟议增加3个未提取的第6周期TpBaR对铅制电路板的影响

获取原文

摘要

The Tritium Readiness Program is planning to ship three (3) additional unextracted Tritium Producing Burnable Absorber Rods (TPBARs) in the Lead Test Assembly (LTA) container to SRS for disposal. These rods are from the PIE (Post Irradiation Examination) program that is currently underway at ANL-W and will not have been extracted. The three rods were irradiated in Watts Bar Cycle 6 (irradiation was completed on February 22, 2005) after which they were sent to ANL-W for neutron radiography and gamma scanning. Once arriving at SRS, the LTA will be placed within the first TPBAR disposal container which will then be disposed within the Intermediate Level Vault (ILV). To determine the potential impact with respect to those performance measures, this UDQE addresses the proposed action to include the 3 PIE TPBARs, with an associated 2.8E+04 Ci of tritium, within the LTA.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号