Hanford Engineer Works monthly report, July 1946.

机译:汉福德工程师工作月刊,1946年7月。

获取原文

摘要

This progress report discusses activities at the Hanford Engineer Works for the month of July 1946. Operations in the 100 D and 100 F Areas were uneventful. Power levels were maintained at 250 and 200 megawatts (MW) respectively. Scheduled outage was taken in each area for metal discharge and for routine maintenance. Operating time efficiency was 90.0%. The 200 E Area operated on a standard cycle throughout the month while the 200 W Area was scheduled on a reduced basis. No unusual difficulties were encountered during the month. Safety performance was quite satisfactory and the sixth consecutive month was completed without a time losing injury. Progress was made pointing toward the transfer of the operating contract to the General Electric Company on September 1, 1946. Preliminary organization charts for the various departments have been prepared and issued by the General Electric Company. Termination notices for both monthly and weekly employees have been distributed and a high percentage returned. Transfer schedules for personnel leaving the project have been arranged. Work in connection with contract assignments both with employees and facility operators is under way. There was an appreciable increase in terminations during the month with a total of eighty separated from the roll. Plant force at month end was 4270.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号