HRT Cooling Water System Evaluation Results of HRT Engineering Tests Ⅵ A-2 ,3, 4, 5;B-1 a, b and B-3

机译:HRT冷却水系统HRT工程试验评估结果Ⅵa-2,3,4,5; B-1 a,b和B-3

获取原文

摘要

The cooling water system has been tested and found to perform satisfactorily isothermally with the following important exceptions:n1. The maximum observed flow to the fuel sample cooler was 3.8 gpmc The flowsheet specifies a maximum flow of 8 gpm.n2. The maximum observed flow to the blanket sample cooler was 5.4 gpm. The required flow is 8 gpm.nLarger inlet and exit lines to these coolers would permit more flow. It is recommended that these line sizes be increased from l/2-in. to 1-in.nOf less importance is that the maximum flows to the fuel and blanket dump coolers were 4.1 and 21 gpm, respectively, compared to 10 and 30 gpm specified by the flowsheet.

著录项

  • 作者

    R. E. Brooksbank;

  • 作者单位
  • 年度 1956
  • 页码 1-6
  • 总页数 6
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;