首页> 美国政府科技报告 >PROCEDURES FOR THE ASSEMBLY, INSTALUTION AND TESTING OF PWR CORE 1 REACTOR COMPONENTS AND HANDLING EQUIPMENT
【24h】

PROCEDURES FOR THE ASSEMBLY, INSTALUTION AND TESTING OF PWR CORE 1 REACTOR COMPONENTS AND HANDLING EQUIPMENT

机译:压水堆核心1反应堆组件和处理设备的装配,安装和测试程序

获取原文

摘要

The purpose of this book is to bring together in one document the procedures prepared to facilitate the safe and proper assembly, installation and check—out of the PWR Core 1 reactor components, including the associated refueling and handling equipment which were supplied by the FWR Reactor Design Subdivision. .nB. ScopenIncluded within the scope of this document are the requirements for:n1. Pre-installation core assembly at Bettis and subsequent reassembly at Shippingporton2. Pre-installation operations on handling equipment and reactor-vessel head and head appurtenances.n3. Reactor installation

著录项

  • 作者

    Lawton D. Geiger;

  • 作者单位
  • 年度 1958
  • 页码 1-454
  • 总页数 454
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号