首页> 美国政府科技报告 >TEST RESULTS DL-S-184 T-612076 PERIODIC RADIATION SURVEY OP REACTOR PLANT CONTAINER AND COMPONENTS AFTER SHUTDOWN 'A' SURVEY SECTION X FOURTH PERFORMANCE CORE I - SEED I
【24h】

TEST RESULTS DL-S-184 T-612076 PERIODIC RADIATION SURVEY OP REACTOR PLANT CONTAINER AND COMPONENTS AFTER SHUTDOWN 'A' SURVEY SECTION X FOURTH PERFORMANCE CORE I - SEED I

机译:测试结果DL-s-184 T-612076周期性辐射调查Op反应堆工厂容器和组件关闭后“a”调查部分X第四个性能核心I - 种子I

获取原文

摘要

To determine the general area radiation level in the Boiler Compartments using Channel 5 of the Operational Radiation Monitoring System.nThe data indicates that the general area radiation level in. the Boiler Compartments after 3587.5 EFPH was relatively low following shutdown of the reactor. The 1A Boiler Compartment, which has the largest number of loop service hours, was the only Compartment in which the radiation level was more than 10 MR/Hr., which is the lowest reading on the Channel 5 meter scale.

著录项

  • 作者

  • 作者单位
  • 年度 1959
  • 页码 1-11
  • 总页数 11
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号