首页> 美国政府科技报告 >LAYOUT PRINCIPLES OF MAIN PLANT BUILDING
【24h】

LAYOUT PRINCIPLES OF MAIN PLANT BUILDING

机译:主要植物建筑的布局原则

获取原文

摘要

The fuel receiving and storage facilities comprise an unloading and storage area for containers, which is served by a gantry crane of 80 tons capacity, a leak testing and a container-decontamination facility, which is also served by crane, and a group of ponds for unloading, mechanical handling, and storage of fuel elements. The ponds are connected with the head end of the process building by a charging canal. At the end of this charging canal the fuel elements will be lifted and brought to a special cell for mechanical treatment. This cell is located adjacent to the group of dissolver cells. Because of the very high ground-water level, the whole building is arranged above ground.

著录项

  • 作者

    E. Luscher;

  • 作者单位
  • 年度 1960
  • 页码 1-5
  • 总页数 5
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号