首页> 美国政府科技报告 >DESIGN SUMMARY REPORT for the GETR - HELIUM LOOP-1
【24h】

DESIGN SUMMARY REPORT for the GETR - HELIUM LOOP-1

机译:GETR - HELIUm LOOp-1的设计摘要报告

获取原文

摘要

In September, 1958, the General Electric Company contracted with the Union Carbide Nuclear Company to build and operate a multiple facility helium gas cooled loop for the testing of gas cooled reactor prototype elements. The ori¬ginal design work and installation of the facility were completed by the end of March, 1959. Subsequent check-out operations required further design effort and modifications to the equipment to permit the realization of reference design conditions. The adaptation of standard commercial equipment to the handling of presurrized helium gas presented problems with which industry in general had little or no experience.

著录项

  • 作者

    R. F. Hausman;

  • 作者单位
  • 年度 1960
  • 页码 1-321
  • 总页数 321
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号