首页> 美国政府科技报告 >Beam Diagnostics, Collimation, Injection/Extraction, Targetry. Accidents and Commissioning: Working Group C&G Summary Report
【24h】

Beam Diagnostics, Collimation, Injection/Extraction, Targetry. Accidents and Commissioning: Working Group C&G Summary Report

机译:光束诊断,准直,注入/提取,目标。事故和调试:C&G工作组总结报告

获取原文

摘要

The performance of accelerators with high beam power or high stored beam energy is strongly dependent on the way the beam is handled, how beam parameters are measured and how the machine is commissioned. Two corresponding working groups have been organized for the Workshop: group C 'Beam diagnostics, collimation, injection/extraction and targetry' and group G 'Commissioning strategies and procedures'. It has been realized that the issues to be discussed in these groups are interlaced with the participants involved and interested in the above topics, with an extremely important subject of beam-induced accidents as additional topic. Therefore, we have decided to combine the group sessions as well as this summary report. Status, performance and outstanding issues of each the topic are described in the sections below, with additional observations and proposals by the joint group at the end.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号