首页> 美国政府科技报告 >DEVELOPMENT AND EVALUATION OF PROTOTYPE REMOTE-CONTROLLED SODIUM-BONDING AND BOND-INSPECTION PROCESSES FOR EBR-II FUEL CYCLE FACILITY
【24h】

DEVELOPMENT AND EVALUATION OF PROTOTYPE REMOTE-CONTROLLED SODIUM-BONDING AND BOND-INSPECTION PROCESSES FOR EBR-II FUEL CYCLE FACILITY

机译:EBR-II燃料循环设备原型遥控结合和粘结检测过程的开发与评价

获取原文

摘要

The EBR-II plant includes an integral, remote-controlled Fuel Cycle Facility wherein spent fuel elements are to be pyrometallurgically refined, refabricated, inspected, and reassembled for return to the reactor. This report describes the experimentally supported changes and refinements made in the prototype sodium-bonding and bond-inspection equipment to ensure:(1) acceptable fuel elements for the initial core loading;and (2) equally acceptable elements in production quantities in the parent installation. More specifically, the mode of imparting bonding energy to the fuel element was changed from a vibratory action to a series of timed impacts. This reflected an increase in the yield of acceptable elements and a reduction of machine operation time. A nondestructive, eddy-current instrument was developed and demonstrated as capable of detecting all defects in the liquid sodium bond.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号