首页> 美国政府科技报告 >Computer Programme DISCOUNTnFor Estimating Costs of Electricity and Prices of Plutonium from Nuclear Power Systemsn(First Supplement)
【24h】

Computer Programme DISCOUNTnFor Estimating Costs of Electricity and Prices of Plutonium from Nuclear Power Systemsn(First Supplement)

机译:计算机程序关于估算核电系统中电力成本和钚价格的计算机程序(第一补编)

获取原文

摘要

TRG Report 198 (R) describes the DISCOUNT programme for the Ferranti Mercury computer, and gives a detailed account of version B of the programme. Since the report was issued two improvements have been made, resulting in a new version, C. The first improvement is in the calculation of actual equil¬ibrium delay time and the second in the provision of additional input data governing the transfer of plutonium from capacity withdrawn.nThe actual equilibrium delay time refers to the initial period of operation of a reactor during which it is assumed to produce no plutonium and at the end of which it produces plutonium at its normal rate. In version B of the programme, this time for any half-year was derived in Routines 2 and 9, depending on whether the half-year occurred before or after time zero.

著录项

  • 作者

    C. E. ILIFFE;

  • 作者单位
  • 年度 1963
  • 页码 1-14
  • 总页数 14
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号