When the 140 ft. long, 30 ft. wide, 3,000 ton concrete radiation shield wall on Nimrod between the Magnet Room and Experimental Hall was moved some 50 ft. it was thought desirable to measure foundation movements resulting to assess the effect on machine alignment. This report shows the readings taken in graphical form and assesses the effect of the shield wall movement on the foundations.
展开▼