首页> 美国政府科技报告 >TEST OPERATION AND COST ESTIMATION ON THE WASTE TREATMENT PLANT AT JAERI
【24h】

TEST OPERATION AND COST ESTIMATION ON THE WASTE TREATMENT PLANT AT JAERI

机译:JaERI废物处理厂的试运行和成本估算

获取原文

摘要

The report provides both performance data on test operations conducted through March I960 and treatment cost estimates concerning the Radioactive Waste Treatment Plant at JAERI (cf. JAERI-1021).nTest operations were first conducted with non-radioactive materials, and then, with real radioactive wastes from JAERI. The flocculation and ion exchange unit, evaporation unit. and incineration unit were examined. The performance data showed that the facilities fulfilled their specified functions expected from the initial planning.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号