首页> 美国政府科技报告 >ISTHMIAN CANAL STUDIES - 1964 INCLOSURE A--ON-SITE SURVEY PROGRAM TO APPENDIX 2 OF ANNEX III CONSTRUCTION OF AN ISTHMIAN SEA-LEVEL CANAL BY NUCLEAR METHODS--1964
【24h】

ISTHMIAN CANAL STUDIES - 1964 INCLOSURE A--ON-SITE SURVEY PROGRAM TO APPENDIX 2 OF ANNEX III CONSTRUCTION OF AN ISTHMIAN SEA-LEVEL CANAL BY NUCLEAR METHODS--1964

机译:伊斯兰党运河研究 - 1964年对附件3的附录2进行现场调查计划 - 通过核方法建造伊斯兰海水平运河 - 1964年

获取原文

摘要

The major items of cost included under this conventional construction are river diversion, flood control, construction camps, harbor and permanent townsite development, and construction of several hundred miles of access roads. The need for the first two items must be determined on the basis of rainfall, runoff, and stream flow data in various drainage basins, and the effect of a sea-level canal on the drainage system of the area. The cost of the construction will be determined largely by the, topography and geology of the area. The cost of harbor development will depend on the nature of the coastline and the sea approaches to the specific site chosen for the canal. The effort required to build the roads can be affected greatly by the soil properties, topography and drainage conditions in the area.

著录项

  • 作者

  • 作者单位
  • 年度 1964
  • 页码 1-27
  • 总页数 27
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号