FABRICATION COSTS FOR PLUTONIUM FUEL ELEMENTS PART C:VARIABLE COSTS OF FABRICATING U02-Pu2 FUEL RODS FOR THE SAXTON REACTOR

机译:钚燃料元件的制造成本第C部分:为saXTON反应器制造U02-pu2燃料棒的可变成本

获取原文

摘要

The shop labor requirements for each rod were 4.27 man-hours direct labor and 1.41 man-hours indirect labor. The direct material cost was $43 per fuel rod. The variable costs included direct materials, some processing costs for nuclear materials, shop labor, maintenance, direct overhead, and consumable supplies but did not include the cost of nuclear materials themselves, use charges, administrative overhead, research, development, or engineering costs.

著录项

  • 作者

    C. H. BLOOMSTER;

  • 作者单位
  • 年度 1965
  • 页码 1-35
  • 总页数 35
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号