首页> 美国政府科技报告 >Nuclear Thermionic Power Plant Integration Problems
【24h】

Nuclear Thermionic Power Plant Integration Problems

机译:核热电厂一体化问题

获取原文

摘要

The numerous boundary conditions to be met in preparing a well proportioned, properly integrated design for a thermionic cell reactor are discussed with the emphasis on materials and fabrication problems. Pertinent experience with fuel elements, tube header sheets, electric heaters, and pressure vessels is cited to highlight key limitations that have been encountered in structurally similar equipment. A reference design is presented to indicate how one might attempt to satisfy all of the many boundary conditions. The study indicates that it will be difficult to get a reactor core power density greater than about 35 w/cm exp 3 and that, while it is possible to minimize the ill effects of failures within individual cells by employing series-parallel connections, the study further indicates that there is inherently a high probability of leaks and electrical shorts and arcs within the reactor so that it is doubtful that good reliability can be obtained. (ERA citation 03:017819)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号