首页> 美国政府科技报告 >Cost Study of Product Water Conveyance and Electric Power Transmission for Large Nuclear Dual-Purpose Plants.
【24h】

Cost Study of Product Water Conveyance and Electric Power Transmission for Large Nuclear Dual-Purpose Plants.

机译:大型核两用工厂产品输水和电力传输成​​本研究。

获取原文

摘要

Purpose of this report is to present the results of an engineering study to develop capital and operating cost data for water conveyance and electric power transmission systems. This information is to be used in connection with siting studies being conducted at ORNL for large nuclear dual-purpose plants producing fresh water and electric power.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号