首页> 美国政府科技报告 >B&D power and water plant modifications and operation after deactivation of D reactors
【24h】

B&D power and water plant modifications and operation after deactivation of D reactors

机译:D反应堆停用后的B&D电力和水厂改造和运行

获取原文

摘要

Pursuant to the decision of the Atomic Energy Commission to deactivate a fourth Hanford production reactor, engineering studies were initiated in regard to the water supply and distribution systems of the smaller production reactor complex. It was the intent of these studies to effect optimization of the water supply and distribution system which would result in a more effective operation and would continue to meet existing standards and requirements. It is the purpose of this report to document the results of the engineering studies and to describe the functional requirements of the overall water supply and distribution systems.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号