首页> 美国政府科技报告 >Preliminary project proposal for process area ventilation modifications 231-Z Building. Revision 1.
【24h】

Preliminary project proposal for process area ventilation modifications 231-Z Building. Revision 1.

机译:过程域通风改造的初步项目建议231-Z Building。修订版1。

获取原文

摘要

It is proposed to design and install a new heating and ventilation system for the process area of 231-Z Building. The proposed system provides increased ventilation capacity to meet the present process requirements of the building with capacity for modest expansion. A mechanical refrigeration recirculating type system will be utilized in order to improve the process environment by controlling humidity within reasonable limits. The project includes demolition and removal of the existing ventilation system and construction of a new equipment room to house the new equipment. No changes are proposed in the present equipment process exhaust system.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号