首页> 美国政府科技报告 >LOADING OF FUEL AND REFLECTOR ELEMENTS IN THE FORT ST. VRAIN INITIAL CORE (RESULTS OF START-UP TEST A-l)
【24h】

LOADING OF FUEL AND REFLECTOR ELEMENTS IN THE FORT ST. VRAIN INITIAL CORE (RESULTS OF START-UP TEST A-l)

机译:加载FORT sT的燃料和反射元件。 VININ INITIaL CORE(启动测试结果a-l)

获取原文

摘要

The loading of FSV fuel and reflector elements was started on December 27, 1973. Loading was carried out on a 24-hr/day basis;and the last ele-ment was loaded January 16, 1974, 20 days after the start of loading. Fig. 1 shows the time progression of the loading.nThe fuel elements, side reflector elements and top reflector elements were inspected, brought to the refueling floor and loaded by manual methods into the reactor through the PCRV penetrations in a prespecified sequence, using special loading equipment. In general, the seven elements comprising one layer of a region (normally seven but up to eleven in the outer regions) were loaded through the refueling penetration for that region, and the en¬tire layer loading completed prior to loading the next layer.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号