Draft Supplement to the Environmental Statement, Fiscal Year 1976 Proposed Program. Facilty Location Evaluation for Franklin-Badger Canyon 230-KV Line and Badger Canyon Substation Study Area 74-6B

机译:环境声明补充草案,1976财政年度拟议计划。富兰克林 - 獾峡谷230-KV线和獾峡谷变电站研究区74-6B的设施位置评估

获取原文

摘要

Proposed is the construction of a 15-mile, 230-kV double-circuit transmission line from Franklin Substation near Pasco, Washington, to a proposed new Badger Canyon Substation to be constructed 5 miles west of Kennewick, Washington. Depending on the final route location chosen, approximately 15 miles of 230-kV double circuit transmission line requiring 5.6 miles of new and 9.4 miles of existing right-of-way would be needed as well as approximately 2500 feet of new access road. Land use affected includes crossing Sacajawea State Park and passig through irrigated cropland and grassland on existing right-of-way, and depending on the alternative route chosen, could cross land proposed for residential development and a proposed interstate highway. An additional 10 to 11 acres of potential cropland would be required for the proposed substation. Disturbance to wildlife during construction would occur and habitat associated with the above land uses would be eliminated. Some erosion and sedimentation would occur. Visual impacts would affect Sacajawea State Park, a proposed highway, and potential residential development land. Noise and other disturbances to residents will occur, primarily during construction. (ERA citation 10:044169)

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号