首页> 美国政府科技报告 >Failure Analysis and Failure Prevention in Electric Power Systems:First Annual Progress Report
【24h】

Failure Analysis and Failure Prevention in Electric Power Systems:First Annual Progress Report

机译:电力系统故障分析与故障预防:第一次年度进展报告

获取原文

摘要

Six technical tasks have been identified as necessary to achieve the program goal of increased reliability and safety of electric power plants. Analysis of past operating and malfunction experience (Task I) has been used to identify problem areas which are potentially hazardous or costly and which should be subjected to detailed engineering analysis (Task II) or simulation tests (Task V). Input data on the, actual environment and loading (Task III) and on the materials and structural properties (Task IV) have been obtained, and specific engineering analyses have been performed. Tasks I-V have provided a quantitative basis for developing improved failure prediction and prevention programs (Task VI). The analyses completed include flaw indictions in the nozzle to shell weld of the Pilgrim 1 vessel, a corner crack in the nozzle of a test pressure vessel, a crack in a butt weld under the influence of residual stresses, and flaws in the near bore area of steam turbine rotors.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号