Shutdown and post-test examination plan for the small steam generator model (SSGM)

机译:小型蒸汽发生器模型(ssGm)的停机和测试后检验计划

获取原文

摘要

A detailed working plan to terminate and to examine the Westinghouse duplex tube small steam generator model (SSGM) is defined and presented. Following completion of the current phase (DNB Corrosion Testing in Off-Normal Water Chemistry) of testing, the Advanced Reactors Division GPL-1/SWL-1 Loops will be shut down on both the water side and the sodium side. The SSGM will be cleaned prior to removal of the model from the test silo. During disassembly and following removal of the model to a dissection area at ARD, visual and photographic records of SSGM will be made. Secondary cleaning and initial dissection into seven sections will be conducted with protective oils and plastic bags used to inert the outer shell and duplex tube samples. The major sampling and detailed microscopic examination of the duplex tubing, tube-to-tubesheet welds and tube-support pads will be made following shipment of the dissected model to Tampa. A 72-inch section containing the region over which the DNB interface moved during the SSGM testing will be inerted and shipped to General Electric Company for their examination.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号