首页> 美国政府科技报告 >A PICTORIAL TOUR OF THE SYNTHANE PILOT PLANT
【24h】

A PICTORIAL TOUR OF THE SYNTHANE PILOT PLANT

机译:合成飞行员工厂的图片游览

获取原文

摘要

The Synthane pilot plant (fig. 1) is a facility designed by the Lummis Co. to convert 75 tons of coal per day into 1 MSCF of high-Btu pipeline gas. It is based on the Synthane process developed by the Bureau of Mines at the Pittsburgh Energy Research Center (PERC) in Bruceton, Pa. About 100 people will be employed by Lummis to operate the complex for the Bureau of Mines. The overall process scheme includes coal handling and pressurization, pretreatment and gasification, and a series of cleanup and conversion operations. The cost of the plant, which is being built by the Rust Engineering Co., is about $13,000,000, and it will cost approximately $5,000,000 per year to operate. Now we shall precede with a tour of the Synthane pilot plant facilities.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号