Environmental monitoring data for the years 1972 through 1975 pertaining to the Zion Station, which began commercial operation in 1974, were analyzed by the most practical qualitative and quantitative methods. Thermal plume, water chemistry and aquatic biota data were evaluated and the results are presented. The results showed no significant immediate deleterious effects, thus confirming preoperational predictions. Although the plant has not operated long enough to reveal long-term deleterious effects, the present indications do not lead to a concerned prediction that any are developing. The data utilized, the methods of analysis, and the results obtained are presented in detail, along with recommendations for improving monitoring techniques. (ERA citation 02:020005)
展开▼