首页> 美国政府科技报告 >A METHOD FOR STRESS DETERMINATION IN N, E, AND T TUNNELS NEVADA TEST SITE, BY HYDRAULIC FRACTURING, WITH A COMPARISON OF OVERCORING METHODS
【24h】

A METHOD FOR STRESS DETERMINATION IN N, E, AND T TUNNELS NEVADA TEST SITE, BY HYDRAULIC FRACTURING, WITH A COMPARISON OF OVERCORING METHODS

机译:采用水力压裂方法测定N,E,T隧道内瓦达试验场应力的方法,并与过采方法进行比较

获取原文

摘要

Twenty-nine intervals in 10 core holes were hydraulically fractured in N, E, and T tunnels, Nevada Test Site, during 1974. Certain pressures were determined and related to the ambient stress field, but the orientation of the hydraulic fractures was not measured. These data and data from previous investigations in G tunnel indicated that both the magnitude of the hydraulic pressures and the direction of fracturing are independent of the orientation of the core holes. The maximum and minimum principal compressive stresses determined by the hydraulic fracturing methods are good approximations of those determined by nearby overcore methods. The data show that a good approximation of the magnitudes of the maximum and minimum principal stress axes can be obtained from several hydrofractured intervals in one core hole.

著录项

  • 作者

    C. H. Miller;

  • 作者单位
  • 年度 1976
  • 页码 1-15
  • 总页数 15
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

  • 入库时间 2022-08-29 11:38:17

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号